Hoan Bridge Reconstruction Project

GRAEF was selected by WisDOT to provide engineering design services for this complex freeway rehabilitation project. Key elements of the project included redecking of the 2 mile long Hoan Bridge along with rehabilitation details for the steel girders.

Additional work included placement of a concrete overlay on the 29 units that comprise the Lake Interchange. Other elements included bridge replacements linking I-794 with local streets west of the Lake Interchange, construction staging and traffic management.

Due to size and complexity of the project, construction was completed in three years.

To address the aggressive schedule and significant project demands, GRAEF teamed with Michael Baker Jr. to address the entire design contract.

Del

Del Prado Boulevard Bridges

Five bridges in Florida.
Claude

Claude Allouez Bridge

Claude Allouez Bridge & Roundabout
Hoan

Hoan Bridge Inspection

In-depth inspection of the Hoan Bridge.
Fannie

Fannie Road Bridge

Repairing a structurally deficient bridge.
Bridges

STH 145 Construction Inspection

Construction inspection of 5 roundabouts & 2 bridges.
Hoan

Hoan Bridge

Complex Hoan Bridge and Lake Freeway reconstruction project.




Mary Beth Pettit,Principal - Milwaukee Mary Beth Pettit
Principal - Milwaukee
marybeth.pettit@graef-usa.com
414 / 266-9175


CONTACT OUR EXPERTS >