Our Work : Services
MEP / Fp

Utilizing practical experience coupled with creativity and ingenuity to solve the most diverse challenges.

Manitowoc Crane Campus Upgrade Manitowoc Crane Campus Upgrade Manitowoc Crane Campus Upgrade

Manitowoc Crane Campus Upgrade

Manitowoc Crane Company expanded its Manitowoc facilities to meet demands for growth and capacity. GRAEF provided planning, architectural, structural, site/civil and MEP engineering services for the $25 million renovation and modernization projects which were completed in multiple phases.

The Manitowoc campus expansion included numerous renovations and additions. A new 4,000 square foot employee support area with lunchroom, locker rooms, and tool room was added to better accommodate the growing staff at this site. The assembly addition was designed to build a new ultra large crawler crane which has a capacity of over 1 million pounds and has a 700 foot boom. GRAEF designed two major machine foundations as part of the project; a boring bar foundation and a gantry boring bar foundation. The plate processing addition is 14,000 sq. ft. and accommodates a blast booth for steel FAB operations. The boom weld addition is 23,900 sq. ft. and gives added capacity for both boom welding operations for new machining. GRAEF designed two large machine foundations for this building.

Designs incorporated direct fired make-up air units for the heating season and summer ventilation fans for the cooling/ventilating season which are controlled together to ensure adequate building pressure. All new additions and renovations are being designed/upgraded with controls to tie into the existing central building automation system. Electrical work included designing the site looped power distribution system, equipment power, and interior lighting for building additions. A power load study was conducted to determine upgrade requirements for the 13.2 KV primary power loop.

Canaveral

Cruise Terminal #6

Renovating the 3rd busiest port in the world.
Dommerich

Dommerich Elem., Maitland Middle School

Renovating two schools simultaneously!
Renovations

Orioles Spring Training Facility

The Baltimore Orioles were remodeling!
Caterpillar

Caterpillar (Bucyrus International)

Bringing manufacturing space into the 21st century.
Lake

Lake Eva Park

Sprucing up Lake Eva for the 4th of July.
University

UCF Commissioning Services

Enhanced LEED® commissioning for UCF.
Manitowoc

Manitowoc Crane Campus Upgrade

A $25 million renovation to meet growth and capacity demands.
Midland

LEED Silver Certified Bank Design

MEP Engineering for 79,500-square-foot Midland States Bank headquarters.
ABB

Commissioning at Innovation Campus

95,000-square-foot office building in UWM's Wauwatosa Innovation Campus.
FLL

FLL Terminal 1 Baggage Handling System

New technology requires renovations.
College

College of DuPage

Multiple MEP projects on Glen Ellyn, IL campus
Orlando

Better lighting in Orlando

Energy efficient renovation to 7 million square feet parking garages




Joe Schuller,Principal - Milwaukee Joe Schuller
Principal - Milwaukee
joe.schuller@graef-usa.com
414 / 266-9139


CONTACT OUR EXPERTS >