Skip to content

Mechanical, Electrical, Plumbing Engineering

Manitowoc Crane High Bay Heavy Assembly Addition

Manitowoc Crane High Bay Heavy Assembly Addition Manitowoc Crane Company expanded its Manitowoc facilities to meet demands for growth and capacity. GRAEF provided planning, architectural, structural, site/civil and MEP engineering services for the renovation and modernization projects which were completed in multiple phases. The Manitowoc campus expansion included numerous renovations and additions. A new 4,000-square-foot…

Read More

Caterpillar North of Rawson Facility

Caterpillar North of Rawson Facility GRAEF helped develop a space utilization program and provided design services for this new 260,000 SF facility with fabrication shop, warehouse and high density rack storage system. Employee support areas include restrooms, conference rooms, offices, lunch rooms and a medical office. A new central compressed air plant was designed to…

Read More

Komatsu Fabrication Building

Komatsu Texas

Komatsu Fabrication Building Komatsu Mining Corp. is building a new fabrication building in Longview Texas. The 167,000-square-foot heavy manufacturing facility will produce the world’s largest wheel loader with an operating weight of 477,100 – 486,250 pounds. The facility includes two crane bays with two 50-ton gantry bays each. There are also several semi-gantry cranes under…

Read More

Caterpillar Fab Shop

Caterpillar Fab Shop Caterpillar (Bucyrus) retained GRAEF to evaluate their existing fab shop and improve the space. The facility was outdated and bottlenecks and inefficiencies were common in the process flow. The fab shop included 12,300 square feet of workstations and 14,000 square feet of staging areas and aisles. GRAEF conducted value stream mapping, gap…

Read More

Gulfstream Park Pegasus

Gulfstream Park Pegasus Gulfstream Park is one of the premier venues for horse racing in the country with some of the world’s top thoroughbred contenders passing through here on their way to the Triple Crown. The Park also boasts a world-class casino, dining, and shopping. GRAEF was part of a team who designed the new…

Read More

Coca-Cola Refreshments Bottling Line Expansion

Coca-Cola Refreshments Bottling Line Expansion Coca-Cola Refreshments’ Tampa facility replaced two existing Carbonated Soft Drink (CSD) lines with two new Blow Fill CSD lines. GRAEF was part of a design-build team that designed facility modifications and system enhancements to accommodate the new blow fill lines. GRAEF is provided industrial architecture services and structural, mechanical, electrical,…

Read More

Park Arthur Pavilion

Park Arthur Pavilion The City of Muskego retained GRAEF for the design of a pavilion with heated bathrooms, storage, concessions area, and an open air picnic shelter. The project was performed in conjunction with planned athletic field lighting and existing park amenities. GRAEF’s design included vandal-proof materials whenever possible, “green” materials where applicable, paved ADA-compliant…

Read More

Wisconsin State Capitol Dome Moisture Repair

Wisconsin State Capitol Dome Moisture Repair Designated in 2001 as a National Historic Landmark on the National Historic Register, the Wisconsin State Capitol has the only fully granite dome in the United States, and is comprised of dimensional granite cladding over a clay book-tile substrate. The dome is structurally supported by a circular ring of…

Read More

Caterpillar Heritage Building

Caterpillar Heritage Building The expansion and renovation of the Caterpillarexisting facility in South Milwaukee was completed over a three year period covering 234,000 square feet. GRAEF completed a Master Plan/Study for Caterpillar’s Heritage Building and provided all professional design and construction services, including specialized façade services. This fast-track project was phased to allow design and…

Read More

City of De Pere VFW Aquatic Center

De Pere VFW Aquatic Center Voters in De Pere, Wis., approved a plan for the city to convert its two public pools into “mini aquatic centers” and fund their operations in a referendum in November of 2018, and is targeted for completion in May of 2021. The De Pere Common Council approved a revised plan…

Read More